Bramleigh
The excavated build-up beneath a driveway: compacted stone over the subgrade A finished block paved driveway, wet after rain Move across to scrape the surface back

Every drive that failed looked perfect on the day it finished.

What goes wrong is always underneath: not enough sub-base, no edge restraint, or water with nowhere to go. None of it is visible in a photograph, so scrape this one back and look.

Marshalls register · CHAS accredited Trial hole before every quote Nottingham & Derbyshire

Two quotes for the same drive
can differ by a third.

And both can be honest, if one of them is for 100mm of compacted stone and the other is for 75mm. Nobody can tell the difference once the blocks are down, which is exactly why it gets left out.

Ask every quote you are holding for two numbers: the sub-base depth and the total excavation depth. It takes nine seconds on the phone and it sorts them into two piles.

What is under it

Every drive that failed
looked fine on the day.

Set what yours has to carry, what the ground underneath is, and the sub-base depth on the quote you are holding. The section is drawn to scale in millimetres, so if the depth is short you will see exactly how short.

What stands on it
What is underneath
The surface

If your quote does not say, that is worth a phone call before it is worth a comparison.

Driveway build-up cross-section A cross-section through a driveway build-up.
Drawn to scale. Each band is its real thickness in millimetres.
180mmTotal excavation
100mmSub-base needed
1:80Minimum fall

Where these numbers come from
  • 100mm of compacted Type 1 under a domestic car drive on reasonable ground, 150mm under a van, 200mm and upward under a caravan or a horsebox.
  • Clay adds 50mm and a geotextile membrane, because clay holds water and moves with it. Made ground adds about the same and comes out until we reach something that compacts.
  • A 30mm sharp sand laying course under block paving, screeded and then consolidated by the blocks themselves rather than compacted first.
  • 50mm blocks for domestic traffic, 60mm and up where vehicles are heavier.
  • A minimum fall of 1 in 80 away from the house, which is about 25mm of drop over two metres. Easy at setting-out, impossible afterwards.
  • Over 5 square metres of impermeable surfacing in a front garden needs planning permission in England unless the run-off goes to a permeable area inside your own boundary. That has been the rule since October 2008.

These are the ordinary standards for domestic work, not a specification for your particular drive. That comes from a trial hole.

Blocks do not sink.
They spread.

A block is held by the blocks around it. At a free edge there is nothing on one side, so under every vehicle the outer course creeps outward a fraction. Once there is a gap the whole field loosens and the middle settles into it.

The base gets blamed and the edge was the cause. Every free edge on our jobs gets a concrete haunch before a block is laid: half a day, entirely buried, and no photograph will ever show it.

620
Drives laid
1:80
Minimum fall, always
2012
Digging since
5
Day typical job

What people say

They dug a hole in the old drive on the first visit, showed us the clay, and told us the price had to include another 50mm and a membrane. The two cheaper quotes had not looked.

Dave and Lynne M. · Beeston

Told us straight that what we wanted needed planning permission and helped us redesign it so it did not. Nobody else had even raised it.

Raj P. · West Bridgford

Came back a week after finishing to brush more sand into the joints, then again a month later. I had not asked, and I had not been told it was coming.

Angela S. · Long Eaton

Ask the other quotes
for a depth.

We will dig a trial hole, tell you what is under there, and put the number in writing. If the ground is better than we expected, the price comes down.

Get a quote
Demo build by Etari Digitals