Resin bound surfacing
Permeable, seamless, and completely dependent on the base it is laid over.
Resin bound is 15 to 18mm of aggregate and resin. It has no structural strength of its own, so it is only ever as good as the base beneath it. Laid over sound tarmac it lasts beautifully. Laid over a cracked or moving base it will crack in exactly the same places within two winters, and it is the single most common reason we get called to look at somebody else’s work.
A trial hole, not a glance
We dig a small hole at the first visit and look at what is under your drive. Clay, sand, or somebody else’s rubble. It takes ten minutes and it decides the price.
Drainage designed first
Where the water goes, what the falls are, and whether the job needs planning permission. Settled before anybody chooses a colour.
The quote, by depth
Itemised with the excavation depth and the sub-base thickness written on it. A quote without those two numbers is not comparable to anything.
Dig, base, edge
Excavate to the depth quoted, lay and compact the Type 1 in layers, then the concrete haunch to every free edge before a block is laid.
Surface and joint
Lay to the fall, cut the edges, kiln-dried sand brushed and vibrated in twice with a week between. Then we come back and do it a third time.
Asked often
Do I need planning permission for a new driveway?
How deep should the sub-base be?
Why does block paving sink?
Can you lay resin over my existing drive?
Block paving
Laid on a compacted base with a haunched edge, because the edge is what fails first.
Tarmac and repairs
New surfacing, overlays where an overlay is honest, and patching where it is not.
Drainage and groundwork
Falls, channels, soakaways and the paperwork that comes with paving a front garden.